{"id":17211,"date":"2023-10-12T14:56:22","date_gmt":"2023-10-12T12:56:22","guid":{"rendered":"https:\/\/www.ogbl.lu\/?post_type=communiques&#038;p=17211"},"modified":"2023-11-17T18:38:46","modified_gmt":"2023-11-17T17:38:46","slug":"la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux","status":"publish","type":"communiques","link":"https:\/\/www.ogbl.lu\/en\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/","title":{"rendered":"The international line from Luxembourg to Li\u00e8ge through the Ardennes deserves better!"},"content":{"rendered":"<p>On October 11th, 2023, a press conference was held in Gouvy where the two trade unions OGBL\/FNCTTFEL-Landesverband and CGSP Cheminots R\u00e9gionale LVHW (Li\u00e8ge &#8211; Verviers &#8211; Huy &#8211; Welkeraedt) presented their demands regarding the international line Luxembourg &#8211; Li\u00e8ge via the Ardennes.<\/p>\n<p>During the press conference, Ren\u00e9 Birgen, secretary of A\u00d6T (Aktioun \u00d6ffentlechen Transport), presented the joint document of demands.<\/p>\n<p>The two unions welcomed the signing on October 3 by Luxembourg&#8217;s Minister of Mobility and Public Works, Fran\u00e7ois Bausch, and Belgium&#8217;s Minister of Mobility in the Belgian Federal Government, Georges Gilkinet, of a declaration of intent to strengthen rail cooperation between Luxembourg and Belgium, in which both parties commit themselves to the following objectives<\/p>\n<p>Double the share of commuters using trains between the two countries by 2040.<\/p>\n<p>Double the volume of rail freight between Belgium and Luxembourg by 2040<\/p>\n<p>To make rail transport even more attractive by reducing travel times between the two capitals, with the aim of connecting Brussels and Luxembourg in 2 hours by 2030.<\/p>\n<p>However, this declaration of intent does not mention the Luxembourg-Li\u00e8ge line, where investment would be entirely appropriate to reduce the current journey time of 2 hours 39 minutes to 100 minutes. This demand was already made by the Landesverband and the CGSP in 2005, but unfortunately little has been achieved so far. However, it would be possible to reduce the travel time by increasing the speed of the line between Gouvy and Vielsalm from 100 km\/h to 120 km\/h. However, according to an Infrabel official, this would require an investment of around 3 to 4 million euros to correct the curves and adapt the catenary to the new layout.<\/p>\n<p>On the Belgian side, it has been announced that major investments in line 42 are not planned until 2026 and 2027, and that the work will be limited to ballasting and the replacement of individual points to avoid temporary slowdowns on the line.<\/p>\n<p>Another requirement is the use of more comfortable trains on the line. The Siemens D\u00e9siro railcars currently running on the line are far from first-class. Narrow seats in 2\u1d49 class, a single lavatory per power car for a 230-seat train, and a 1\u1d49 class that is not much different from the 2\u1d49 class are not very attractive criteria for enticing additional passengers to make this long train journey. There is therefore an urgent need to use more comfortable vehicles such as SNCB&#8217;s I11 or M6.<\/p>\n<p>Finally, the rail service between Luxembourg and Li\u00e8ge needs to be improved as soon as possible. In addition to improving the timetable, additional trains are needed during the morning and evening rush hours on weekdays and Saturdays. Currently, the first train from Li\u00e8ge does not arrive in Luxembourg until 8:46 a.m., which is far too late for many employees. In the evening, the last train to Li\u00e8ge leaves at 21:16, so an extra train an hour later would make sense.<\/p>\n<p><strong>Communicated by the Syndicate Chemins de fer OGBL\/FNCTTFEL Landesverband,<\/strong><br \/>\n<strong>October 12, 2023<\/strong><\/p>","protected":false},"author":4,"featured_media":17213,"template":"","categorie_communiques":[47],"syndicat":[79],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\r\n<title>The international line from Luxembourg to Li\u00e8ge through the Ardennes deserves better! - OGBL<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"[:fr]La ligne internationale Luxembourg - Li\u00e8ge par les Ardennes m\u00e9rite mieux ![:de]Die internationale Strecke Luxemburg - L\u00fcttich durch die Ardennen hat mehr verdient![:en]The international line from Luxembourg to Li\u00e8ge through the Ardennes deserves better![:] - OGBL\" \/>\r\n<meta property=\"og:description\" content=\"On October 11th, 2023, a press conference was held in Gouvy where the two trade unions OGBL\/FNCTTFEL-Landesverband and CGSP Cheminots \u2026\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/\" \/>\r\n<meta property=\"og:site_name\" content=\"OGBL\" \/>\r\n<meta property=\"article:modified_time\" content=\"2023-11-17T17:38:46+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg\" \/>\r\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\r\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/\",\"url\":\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/\",\"name\":\"[:fr]La ligne internationale Luxembourg - Li\u00e8ge par les Ardennes m\u00e9rite mieux ![:de]Die internationale Strecke Luxemburg - L\u00fcttich durch die Ardennen hat mehr verdient![:en]The international line from Luxembourg to Li\u00e8ge through the Ardennes deserves better![:] - OGBL\",\"isPartOf\":{\"@id\":\"https:\/\/www.ogbl.lu\/de\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg\",\"datePublished\":\"2023-10-12T12:56:22+00:00\",\"dateModified\":\"2023-11-17T17:38:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#primaryimage\",\"url\":\"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg\",\"contentUrl\":\"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ogbl.lu\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"La ligne internationale Luxembourg &#8211; Li\u00e8ge par les Ardennes m\u00e9rite mieux !\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ogbl.lu\/de\/#website\",\"url\":\"https:\/\/www.ogbl.lu\/de\/\",\"name\":\"OGBL\",\"description\":\"THE TRADE UNION\",\"publisher\":{\"@id\":\"https:\/\/www.ogbl.lu\/de\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ogbl.lu\/de\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.ogbl.lu\/de\/#organization\",\"name\":\"OGBL\",\"url\":\"https:\/\/www.ogbl.lu\/de\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.ogbl.lu\/de\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2024\/07\/LOGO_Red_FR-svg.png\",\"contentUrl\":\"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2024\/07\/LOGO_Red_FR-svg.png\",\"width\":369,\"height\":171,\"caption\":\"OGBL\"},\"image\":{\"@id\":\"https:\/\/www.ogbl.lu\/de\/#\/schema\/logo\/image\/\"}}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"[:fr]La ligne internationale Luxembourg - Li\u00e8ge par les Ardennes m\u00e9rite mieux ![:de]Die internationale Strecke Luxemburg - L\u00fcttich durch die Ardennen hat mehr verdient![:en]The international line from Luxembourg to Li\u00e8ge through the Ardennes deserves better![:] - OGBL","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/","og_locale":"en_US","og_type":"article","og_title":"[:fr]La ligne internationale Luxembourg - Li\u00e8ge par les Ardennes m\u00e9rite mieux ![:de]Die internationale Strecke Luxemburg - L\u00fcttich durch die Ardennen hat mehr verdient![:en]The international line from Luxembourg to Li\u00e8ge through the Ardennes deserves better![:] - OGBL","og_description":"On October 11th, 2023, a press conference was held in Gouvy where the two trade unions OGBL\/FNCTTFEL-Landesverband and CGSP Cheminots \u2026","og_url":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/","og_site_name":"OGBL","article_modified_time":"2023-11-17T17:38:46+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/","url":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/","name":"[:fr]La ligne internationale Luxembourg - Li\u00e8ge par les Ardennes m\u00e9rite mieux ![:de]Die internationale Strecke Luxemburg - L\u00fcttich durch die Ardennen hat mehr verdient![:en]The international line from Luxembourg to Li\u00e8ge through the Ardennes deserves better![:] - OGBL","isPartOf":{"@id":"https:\/\/www.ogbl.lu\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#primaryimage"},"image":{"@id":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg","datePublished":"2023-10-12T12:56:22+00:00","dateModified":"2023-11-17T17:38:46+00:00","breadcrumb":{"@id":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#primaryimage","url":"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg","contentUrl":"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2023\/10\/Gouvy-2-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/www.ogbl.lu\/communique\/la-ligne-internationale-luxembourg-liege-par-les-ardennes-merite-mieux\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ogbl.lu\/"},{"@type":"ListItem","position":2,"name":"La ligne internationale Luxembourg &#8211; Li\u00e8ge par les Ardennes m\u00e9rite mieux !"}]},{"@type":"WebSite","@id":"https:\/\/www.ogbl.lu\/de\/#website","url":"https:\/\/www.ogbl.lu\/de\/","name":"OGBL","description":"THE TRADE UNION","publisher":{"@id":"https:\/\/www.ogbl.lu\/de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ogbl.lu\/de\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.ogbl.lu\/de\/#organization","name":"OGBL","url":"https:\/\/www.ogbl.lu\/de\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ogbl.lu\/de\/#\/schema\/logo\/image\/","url":"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2024\/07\/LOGO_Red_FR-svg.png","contentUrl":"https:\/\/www.ogbl.lu\/wp-content\/uploads\/2024\/07\/LOGO_Red_FR-svg.png","width":369,"height":171,"caption":"OGBL"},"image":{"@id":"https:\/\/www.ogbl.lu\/de\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/communiques\/17211"}],"collection":[{"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/communiques"}],"about":[{"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/types\/communiques"}],"author":[{"embeddable":true,"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/users\/4"}],"version-history":[{"count":0,"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/communiques\/17211\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/media\/17213"}],"wp:attachment":[{"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/media?parent=17211"}],"wp:term":[{"taxonomy":"categorie_communiques","embeddable":true,"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/categorie_communiques?post=17211"},{"taxonomy":"syndicat","embeddable":true,"href":"https:\/\/www.ogbl.lu\/en\/wp-json\/wp\/v2\/syndicat?post=17211"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}